
Cadangan Kerja-Kerja Menggantikan Sebuah Jambatan Konkrit (MTB) Serta Kerja-Kerja Berkaitan Di Kampung Linsum, Mukim Rantau, Daerah Seremban, Negeri Sembilan.
2010
Completed Project
Malaysia
2.5606996 N ,101.9498440 E
50m x 4.8m composite bridge crossing Sg. Linggi
1 piece of DURA UBG1750-50m topped with 200mm thk in-situ RC deck
600mm diameter spun pile
Full HA+30HB loading (BD37/01)
JKR Negeri Sembilan

Rolla Enterprise
9 months
5 months
Completed