PACKAGE -5 FOUR LANING OF LONAND DIVEGHAT SECTION OF NH- 965 IN THE STATE OF MAHARASHTRA ON EPC MODE DESIGN CH 166+400KM TO CH 220-900KM
2025
On Going Project
India
18.104389 N ,74.187444 E
Integral Spans and length: 55 m
200mm thick. deck slab with 2 -16m carriageway each resting on 3- UBG 2250 girders connecting integrally with end diaphragm of 2000mm width.
Substructure contains total 8 piers with isolated footing.
Open Foundation
4 lane
National Highway Authority of India
M/S BLOOM COMPANIES LLC
Long Span Structures Pvt ltd.
Thakur Infra Projects Pvt Ltd Joint venture with T & T infra
Substructure is casted on site. Girder casting is in progress.