Construction And Completion of Bridge No. 5 at Sg. Jijan And Other Associated Works for Malaysia Vision Valley (MVV) – Membina Jalan Baru Dari Nilai – Labu Ke Bandar Enstek, Daerah Seremban, Negeri Sembilan
2022
Completed Project
Malaysia
2.714865 N, 101.790573 E
Single Span 33m by 25m Wide (Left & Right) Composite Bridge System.
6 pieces of DURA® UBG1500-33m with Cast In-Situ RC Deck
Cast in-situ RC abutments
600mm dia. Spun pile (Class B)
HA+ 45 units HB loadings (BD37/01)
JKR Malaysia
JKR
Khairi Consult Sdn Bhd
Dura Construction Sdn Bhd
10 Months