Construction of two tunnel (two tubes) of four each (in km 1+040 to km 2+790) 1.75km and km 3+440 to 12+360 (8.92 km) for Missing Link of Mumbai Pune expressway in the state of Maharashtra, India
2024
On Going Project
India
18.749250 N, 73.357250 E
34 Spans 890m long with UHPFRC Composite Bridge
140 pieces of DURA® TB1500 – 25m to 35m
Open Foundation
RC Pile Piers
IRC-6:2017 (70R + Class A)
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED, MUMBAI
LONGSPAN STRUCTURE PVT. LTD
Navayuga Engineering Company Ltd
LONGSPAN STRUCTURE PVT.LTD
Indian Institute of Science