
Construction of New Concrete Bridge at Indian Primary School Serendah, Hulu Selangor District, Selangor Darul Ehsan.(Pembinaan Jambatan Konkrit Bar ke Tapak Sekolah Rendah Tamil Serendah, Daerah Hulu Selangor, Selangor Darul Ehsan)
2016
Completed Project
Malaysia
3.367644N; 101.592685E
Single Span 22m x 5.5m Wide Composite Bridge System.
4 pieces of DURA® IB650-22m, with Cast In-Situ RC Deck
Cast in-situ RC Abutments
300mm dia. Spun Pile (Class B)
HA+KEL and 30 units HB Loadings (BD37/01)
JKR Selangor

JKR Hulu Selangor

Jurutera Perunding Concrete Technology
Generasi Teknik Sdn Bhd
5 months
Completed