
To Construct a Pedestrian Bridge in-front of Nan Hwa Public School, Jalan Lin Chen Mei, Sitiawan, Perak Darul Ridzuan.(Membina Jejantas Di Depan Sekolah Kebangsaan Nan Hwa, Jalan Lin Chen Mei, Sitiawan, Perak D.R.)
2017
Completed Project
Malaysia
4.203252 N, 100.698833 E
Single Span 29m x 2.2m wide Composite Bridge System with Precast Staircase.
1 pieces of DURA ® UBG1250-29m with Cast In-Situ RC Deck
RC Columns
450mm Dia. Spun Piles (Class B)
5 kPa (BD37/01)
JKR Perak

Jurutera Perunding Concrete Technology
Belati Wangsa Sdn Bhd

12 months
Completed