Balance work of Widening of 4 nos existing 2 Lane major Bridge of Six-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn.to Ramanattukara Jn.) section of NH-66 from Design Chainage km 230+400 to Design Chainage km 258.800 (total length 28.400 km) in the State of Kerala on EPC Mode
2025
On Going Project
India
11.31° N, 75.85° E to 11.24° N, 75.81° E
81 Creek bridges 232+836 - Beam Type: UBG1500 ,Length of Bridge: 468m Spans ,Length: 13 X 36 ,Width 15m | 82 Creek bridges 235+389 - Beam Type: UBG1500 ,Length of Bridge: 180m, Spans Length: 5 X 36 ,Width 15m | 83 Creek bridges 254+887 - Beam Type: UBG1500 ,Length of Bridge: 296m, Spans Length: 8 X 37,Width 15m
IRC Loading
National Highways Authority of India (NHAI)
SANZ Kalpin Pvt Ltd
KMC Constructions Limited.
Asia Infrastructure Advisory Services Pvt. Ltd.