
To Replace Buloh Bridge FT005/476/70, Kuala Selangor, Selangor Darul Ehsan (Menggantikan Jambatan Buloh, FT005/476/70, Kuala Selangor, Selangor Darul Ehsan)
2021
Completed Project
Malaysia
3.313171 N; 101.277764 E
Single Span UHPFRC Beam Composite In Situ Deck Bridge System: 15.55m x 22m wide.
14 pieces of DURA® IB650 – 15.55m with Precast RC Deck Stitch with In-situ UHPFRC
2 nos. of Existing Cast in-situ RC abutments
HA+KEL or 45 units HB loadings
Kementerian Kerja Raya
JKR Daerah Kuala Selangor

JKR Malaysia
Jaticon Sdn Bhd
12 Months