
CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA:(Building a new concrete bridge and crossing Klang River connecting Federal Highway with Riveria City development.) – Main Bridge
2023
Completed Project
Malaysia
3.128950 N, 101.690371 E
Single Span 52m by 13.1m (Avg.) Wide Composite Bridge System
4 pieces of DURA® UBG1750-52m with Cast In-Situ RC Deck
Cast in-situ RC abutments
300mm dia. Micropiles (Class B)
HA+ 45 units HB loadings (BD37/01)
Riveria City Sdn Bhd
HSS Integrated Sdn Bhd

Jurutera Perunding Concrete Technology
Dura Construction Sdn Bhd
24 Months
Under Construction