Second Dura Composite Bridge Crossing Sungai Kurau

  • Reset
Project Title

Kerja-Kerja Membina Dan Pencegah Banjir Sungai Kurau Dari Hulu kolam Bukit Merah Ke Pondok Tanjung Sepanjang 8.4 km Serta Kerja Kerja Lain Yang Berkaitan, Dearah Kerian, Perak Darul Ridzuan (Bridge 1 Sg. Kurau CH.3336.5)

Project Year

2014

Status

Completed Project

Country

Malaysia

Structure Type

Single span 50m x 4.8m wide UHPdC U beam composite bridge

Superstructure Feature

1 pieces of DURA® UBG1750-50m topped with 180mm thk in-situ RC deck slab

Substructure Feature

450mm dia. Spun Pile (Class B)

Loading Type

Full HA+30 unit HB loadings

Client

JKR Perak

Consultant

Dura Technology Sdn Bhd

Contractor

Aspasia Construction & Development S/B

Construction Status

Completed