To Construct Bridge at Sungai Chenerai from Tol Chenor to Bandar Tun Abdul Razak Jengka, Maran, Pahang.(Menaiktaraf Jalan Persekutuan FT 83 Dari Tol Chenor Ke Bandar Tun Abdul Razak Jengka, Maran, Pahang)
2018
Completed Project
Malaysia
3.7355540 N; 102.5382080 E
Single Span 50m by 14m Wide (Left & Right) Composite Bridge System.
3 pieces of DURA® UBG2000-50m with Cast In-Situ RC Deck
Cast in-situ RC abutments
300mm dia. Micropiles (Class B)
HA+ 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Malaysia

DPI Konsult Sdn Bhd
Iswarabena Sdn Bhd

12 months
Completed