To Change a Narrow and Old bridge at KM 1.9, 3.3, 4.9 and 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim (Bridge 2).(Cadangan Menggantikan Jambatan Sempit Di KM 1.9, 3.3, 4.9 Dan 7.4 Jalan Sengkang, Bukit Gambir (J143), Ledang Johor, Johor Darul Takzim)
2018
Completed Project
Malaysia
2.2421633 N; 102.6667053 E (Bridge 2)
Single Span UHPC I Beam Composite In Situ Deck Bridge System: 18m x 12.5m wide.
9 pieces of DURA® IBeam650-18m
2 nos. of cast in-situ RC abutments and 2 nos. of cast in-situ RC piers.
450mm dia. Spun pile (Class B)
HA + 30 units HB loadings (BD37/01)
JKR Johor

JKR

Perunding Sejati Sdn Bhd
Golden Kluang Sdn. Bhd.
12 months
Completed