To Upgrade A Bridge At Kampung Telok Garok, Sungai Jernih, Kampung Telok Garok, Selama, Perak
2022
Completed Project
Malaysia
5.254990 N; 100.798255 E
Single Span 13m by 3.5m Wide UHPFRC integral beam-deck system.
2 pieces of DURA® IB650-13m
Cast in-situ RC abutments
200mm x 200mm dia. SQ RC pile (Class B)
HA+ 30 units HB loadings (BD37/01)
Jabatan Tanah Selama
Jabatan Tanah Selama
JPCT
Sadan Works Enterprise
6 Weeks