
The Proposed Construction And Completion Of Kampungstay Air Papan Tourism Development, Mersing, Johor Darul Takzim For The East Coast Economic Region Development Council (Ecerdc) (Bridge 1 & 2)
2022
Completed Project
Malaysia
2.507269 N, 103.835624 E (Bridge 1) , 2.505286 N , 103.837882 E (Bridge 2)
Single Span 15m by 6.5m Wide UHPFRC integral beam-deck system.
4 pieces of DURA® IBeam650-15m
Cast in-situ RC abutments
250mm x 250mm dia. SQ RC pile (Class B)
HA+ 30 units HB loadings (BD37/01)
EAST COAST ECONOMIC REGIAN DEVELOPMENT COUNCIL (ECERDC)
KLCC PROJEKS SDN BHD
ARSEA CONSULTING ENGINEERS SDN BHD
FNA Builders & Services Sdn Bhd