PEMBINAAN JAMBATAN UNTUK AIR PIPE MENYEBERANGI SUNGAI DAN KERJA-KERJA UNTUK PACKAGE 1 (CH+800 TO CH29+800) UNTUK AIR BEKALAN DARI KEMAMAN, TERENGGANU TO GEBENG, PAHANG UNTUL EAST COAST ECONOMIC REGION DEVELOPMENT CONCIL (ECERDC) – SG. BALOK
2023
Completed Project
Malaysia
3.987392 N, 103.388043 E
Single Span 38m by 2.6m (Avg.) Wide Composite Bridge System For Water Pipe Crossing.
1 pieces of DURA® UBG1250-38m with Cast In-Situ RC Deck
Cast in-situ RC abutments
300mm dia. Spun Piles (Class B)
Water Pipe Load + 3 kPa Maintenance Load
Pengurusan Air Pahang Berhad
KLCC Projeks Sdn Bhd
HLA Associates Sdn Bhd
Leika Sdn Bhd