(Merekabentuk, Membina dan Menyiapkan Struktur Untuk Paip Lintasan Sungai di Sungai Anak Endau Serta Kerja-Kerja Yang Berkaitan Di Daerah Rompin, Pahang Darul Makmur)
2024
Completed Project
Malaysia
2.672968 N, 103.598473 E
Three Spans 90m by 2.25m Wide Bridge System For Water Pipe Crossing.
6 pieces of DURA® IB1200-30m with Precast UHPFRC Deck.
Cast in-situ RC abutments and piers
350mm dia. Spun Piles (Class B)
Water Pipe Load + 3 kPa Maintenance Load
Pengurusan Air Pahang Berhad
Pengurusan Air Pahang Berhad
Gagasan Consultant Sdn Bhd
Maznor Infinite Trading
12 months