
PROJEK MEMBINA JALAN PAGALUNGAN – KG.TINANDUK, NABAWAN, SABAH
2025
On Going Project
Malaysia
4.5213701 N , 116.3870451 E
Bridge 1 : One Span 30 m by 10.78m Wide UHPFRC Composite Bridge System Bridge 2 : One Span 24m by 10.78m Wide UHPFRC Composite Bridge System
Br 1 : 4 pieces DURA®IB1300 – 30m | Br 2 : 6 pieces DURA®IB1000 – 24m
Cast in-situ RC abutments
300mm dia. Micro Piles
HA+ 45 units HB loadings (BD 37/01)
Kementerian Desa dan Wilayah
Pengarah Kerja Raya Sabah
Mewa Jadi Sdn Bhd
36 Months