PROJEK MEMBINA JALAN DARI KG JOH KE MATA AYER, MACHANG, KELANTAN- BRIDGE 1,2 & 3
2025
On Going Project
Malaysia
Bridge 1 - 5.838028 N , 102.185361 E , Bridge 3 - 5.864611 N , 102.193417 E
Bridge 1 : Three Spans 84.7m by 11.5m Wide UHPFRC Composite Bridge System , Bridge 2 : Three Spans 101m by 11.5m Wide UHPFRC Composite Bridge System, Bridge 3 : One Span 50m by 11.5m Wide UHPFRC Composite Bridge System
Bridge 1 : 6 pieces of DURA® IB1200 - 25m , 12 pieces of DURA® IB1200 - 30m , Bridge 2 : 12 pieces of DURA® IB1200 - 30m , 6 pieces of DURA® IB1500 - 40m , Bridge 3 : 3 pieces of DURA® UBG1750 - 50m
Cast in-situ RC abutments
600mm dia. Spun Piles
HA+ 45 units HB loadings (BD 37/01)
Kementerian Kemajuan Desa & Wilayah
Pengarah JKR Negeri Kelantan
Perunding Aziz Sehu Sdn. Bhd.
Nazrine Maju Sdn. Bhd.
Jurutera Perunding Al-Ikhlas Sdn. Bhd.
36 Months