CADANGAN MEMBINA JAMBATAN BAHARU DARI KAMPUNG BAHAGIA KE BANDAR TELUK INTAN, DAERAH HILIR PERAK, PERAK DARUL RIDZUAN.
2025
On Going Project
Malaysia
4.028556 N , 101.026667 E
Three spans 180m by 14m Wide UHPFRC Composite Bridge System
9 pieces of DURA®UBG 2500 – 60M
Cast in-situ RC abutments
600mm dia. Spun Piles
HA+ 45 units HB loadings (BD 37/01)
Unit Perancang Ekonomi Negeri Perak
Jurutera Daerah JKR Hilir Perak
Anjung Emas Consultants Sdn. Bhd
Elizon Construction Sdn Bhd
36 Months