
CONSTRUCTION AND COMPLETION OF REMAINING WORKS FOR PROPOSED JALAN KAMPUNG MEDONG/LEBRASAU/KAMPUNG KLID, DAERAH DALAT,BAHAGIAN MUKAH.
2025
On Going Project
Malaysia
2.67532969582 N , 112.0458284 E
One Span 50m by 11.9m Wide UHPFRC Composite Bridge System
3 pieces of DURA®UBG1750 – 50m
Cast in-situ RC abutments
600mm dia. Spun Piles
HA+ 45 units HB loadings BD 37/01
Jabatan Kerja Raya Sarawak

Divisional Engineer, JKR Mukah, Mukah Division
Perunding Amal Teknik Sdn Bhd
Tokoh Ilham Sdn Bhd
36 Months