
PEMBINAAN JAMBATAN DI ATAS SUNGAI ROMPIN, KAMPUNG AUR BUKIT IBAM, ROMPIN PAHANG DARUL MAKMUR.
2025
On Going Project
Malaysia
3.063973 N , 103.011624 E
Three Spans 130m by 8m Wide UHPFRC Composite Bridge System
2 pieces of DURA®2.0 UBG2500 – 60m, 4 pieces of DURA® UBG1500 – 35m
Cast in-situ RC abutments
1200mm dia. Bored Piles
HA+ 45 units HB loadings (BD 37/01)
Kementerian Pembangunan Luar Bandar (KPLB)
Jurutera Daerah, JKR Daerah Rompin
Concrete Technology Consult Sdn. Bhd.
Lambang Cipta Sdn Bhd
24 Months