PROJEK PEMBINAAN JAMBATAN DI KM 117.100, JALAN KOTA KINABALU – KENINGAU – TENOM (500), KENINGAU, SABAH. BRIDGE AT SG. LIAU
2023
Completed Project
Malaysia
5.428969, N, 116.233322 E
Single Span 30m by 11mm Wide Composite Bridge System.
2 pieces of DURA® UBG1750-30m, with Cast In-Situ RC Deck
Cast in-situ RC piers
450mm Dia Spun Piles (Class B)
HA+ KEL & 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Sabah

Concrete Technology Consult Sdn Bhd
Milliplus Sdn Bhd