
PROJEK MEMBINA JAMBATAN SG.TUARAN, PEKAN KIULU – KG BAYAG,TUARAN,SABAH.
2025
On Going Project
Malaysia
6.145181 N , 116.247208 E
Six Spans 135.5m by 11m Wide UHPFRC Composite Bridge System
18 pieces of DURA® IB650-12.37 m to 17.56m , 12 pieces of DURA® IB850 – 19.5m & 20 m, 3 pieces of DURA® UBG1750-50M
Cast in-situ RC abutments
1500mm dia. Bored Piles
HA+ 45 units HB loadings (BD 37/01)
Kementerian Kemajuan Desa dan Wilayah (KKDW)
Pengarah Kerja Raya Sabah
MTR Engineering Sdn Bhd
24 Months