DURA® Technology Sdn Bhd
Dura Technology Sdn Bhd.

To Construct Widening Bridge at Lebuhraya Sultan Iskandar (Lebuhraya Mahameru), Kuala Lumpur (Bridge 1)

  • Reset
Project Title

CADANGAN MEMPERTINGKATKAN PERSIMPANGAT BERTINGKAT DI LEBUHRAYA SULTAN ISKANDAR (LEBUHRAYA MAHAMERU), JALAN TUN RAZAK, JALAN TUN ISMAIL, JALAN IPOH DAN JALAN DI SEKITAR KUALA LUMPUR.

Project Year

2023

Status

On Going Project

Country

Malaysia

GPS Cordinates

3.167592 N, 101.687832 E

Structure Type

Two Spans 26m & 16m by 4.4m Wide (LHS) and Two Span 26m & 16.5m by 1.8m Wide (RHS) UHPFRC integral beam-deck system.

Superstructure Feature

5 pieces of DURA® IB850 – 26m & 5 pieces of DURA® IB850 – 16m

Substructure Feature

Cast in-situ RC abutments and piers

Foundation Feature

1200mm & 1500mm dia. Bored Piles

Loading Type

HA+ 45 units HB loadings (BD37/01)

Client

Datuk Bandar Kuala Lumpur (DBKL)

Superintendent Officer (S.O.)

Datuk Bandar Kuala Lumpur (DBKL)

Consultant

Action Base Consultant Sdn Bhd

Contractor

Infra Lekas Sdn Bhd

Contract Period

12 months