
PROJEK MENAIKTARAF JAMBATAN DAN LAIN-LAIN KERJA BERKAITAN DI JALAN UTAMA KAMPUNG KURNIA JAYA, KAMUNTING, MUKIM TAIPING.
2025
On Going Project
Malaysia
4.913204 N ,100.7159268 E
One span 18 m by 6.0 m Wide UHPFRC Composite Bridge System
4 pieces of DURA®IB650 – 18m.
Cast in-situ RC abutments
200mm dia. RC Piles
HA+ 30 units HB loadings (BD37/01)
PLB Kuala Kangsar
Wangsa Wawasan
12 months