MENAIKTARAF JAMBATAN PASIR BAYAM, RAUB,PAHANG.
2025
Completed Project
Malaysia
3.898184 N , 101.890366 E
One span 50 m by 7.9 m Wide UHPFRC Composite Bridge System
2 pieces of DURA®UBG2000-50M
Cast in-situ RC abutments
300mm dia. Micro Piles
HA+ 45 units HB loadings
Kementerian Kemajuan Desa dan Wilayah
Jurutera Jalan, JKR Daerah Raub,Pahang
Gabungan Inspermata Sdn. Bhd.