
To Upgrade and Build A New Bridge at Kampung Perigi, Acheh, Mukim Sungai Tiram, Daerah Johor Bahru, Johor Darul Takzim (Cadangan Menaiktaraf Jalan Dan Bina Baru Jambatan Kg. Perigi Acheh, Mukim Sungai Tiram, Daerah Johor Bahru, Johor Darul Takzim)
2021
Completed Project
Malaysia
1.439250 N , 103.988778 E
Three Spans 85m by 14m Wide UHPFRC integral beam-deck system (1 Main Bridge & 1 Service Bridge)
4 pieces of DURA® UBG2000-55m & 22 pieces of DURA® IB650-14.75m
Cast in-situ RC abutments & RC piers
450mm dia. spun pile (Class C)
HA+ 45 units HB loadings (BD37/01)
Kerajaan Negeri Johor
JKR Johor
JPCT
Golden Kluang Sdn Bhd
Under Construction