Upgrading Of Jambatan Gita Lama , Kampung Gita Lama On A Design and Build Basis
2025
On Going Project
Malaysia
1.5530526603812653 N , 110.31202974656539 E
One span 16.5m by 8.5m Wide UHPFRC Composite Bridge System
2 pieces of DURA® IB850 – 16.5m
Cast in-situ RC abutments
250 mm dia. Micropiles
HA+ 30 units HB loadings
Jabatan Kerja Raya Sarawak

Jabatan Kerja Raya Sarawak , Kuching Division
Perunding Erasar Sdn. Bhd.
Pet Rocks Malaysia Sdn. Bhd.
12 months