PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH MENAIKTARAF JALAN DARI BONGAWAN KE PAPAR (BRIDGE OVER SG. KIMANIS AR CH 96 + 375) (Upgrading Pan Borneo Highway Sabah from Bongawan to Papar – Bridge over Sg. Kimanis at CH 96 + 375.)
2023
Completed Project
Malaysia
5.622197 N, 115.906122 E
Three Spans 80m by 25.8mm Wide Composite Bridge System.
6 pieces of DURA® UBG1750-45m, 16 pieces of DURA® IB850-14m and 16 pieces of DURA® IB850-19m with Cast In-Situ RC Deck
Cast in-situ RC piers
900mm & 1200mm Bored Piles
HA+ KEL & 45 units HB loadings (BD37/01)
JKR Malaysia

JKR Sabah

Excel Consult Sdn Bhd
Pembinaan Kekal Mewah Sdn Bhd