Rapid reconstruction project of Furong Avenue (Xiangtan Section),K26+643.839 10. Footbridge(芙蓉大道快速化改造(湘潭段)工程K26+643.839 10#人行天桥)
2020
Completed Project
China
27.892321°N, 112.994347°E.
Multiple spans UHPC Composite Bridge System, 12.6m + 36m + 12.6m.
ZL-DURA UBG1560 c/w 180mm thk bridge deck and 3cm Fire Surface Anti-Slip Granite Rock Plate.
RCC Piers
T.B.A
Hunan Communications & Water Conservancy Group Ltd.(湖南交通水利建设集团有限公司)
Hunan Communications Planning Survey and Design Institute Co., Ltd. (湖南省交通规划勘察设计院有限公司)
ZhongLu-dura International Engineering Limited by Share Ltd.(中路杜拉国际工程股份有限公司)
T.B.A
Completed