Project StatusAll ProjectsCompleted(242)On Going(57)Select CountryAll CountriesCanada(3)China(13)India(37)Malaysia(238)Others(8)Select Years All2025 (60)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct New Bridge For Upgrading Road at Jalan Pekan Persiangan – Kg. Lampas – Kg. Sikalabaan Nabawan , Sabah – Bridge 2 Using DURA®IB1000–25mYear: 2025Status: CompletedCountry: Malaysia To Construct New Bridge For Upgrading Road at Jalan Pekan Persiangan – Kg. Lampas – Kg. Sikalabaan Nabawan , Sabah – Bridge 1 Using DURA®UBG2000 – 45m.Year: 2025Status: CompletedCountry: Malaysia To Build New Bridge at Sungai Entabai, Julau, Sarawak using DURA®IB1000-25MYear: 2024Status: CompletedCountry: Malaysia To Construct New Bridge for Flood Mitigation Plan at Sungai Buloh , Selangor using DURA®UBG2250 – 50mYear: 2025Status: CompletedCountry: Malaysia To Replace Steel Bridge to Concrete Bridge at Gelang Patah-Pendas Road , Johor Bahru using DURA®UBG1500 – 40mYear: 2025Status: CompletedCountry: Malaysia To Construct New Bridge for River Corridor Restoration Plan at Sungai Semerting , Bentong , Pahang using DURA®SB350/Integrated Precast UHPFRC BeamYear: 2024Status: CompletedCountry: Malaysia To Build New Utilities Bridge at Anak Endau River , Rompin , Pahang using DURA®IB1200-30m and Precast UHPFRC Deck.Year: 2024Status: CompletedCountry: Malaysia LANING OF EXISTING 2-LANING STRETCH FROM DHARMAPURI AT KM. 117.000 TO LONAND- AT KM. 166.400 (PKG-IV) ON MOHOL-ALANDI SECTION (DESIGN LENGTH 49.400 KM) OF NH-965 IN THE STATE OF MAHARASHTRA ON EPC MODEYear: 2023Status: CompletedCountry: India To Upgrade Bridge at Sungai Sembrong , Batu Pahat , Johor Using DURA®UBG1250-35mYear: 2024Status: CompletedCountry: Malaysia Mumbra Bridge OverlayYear: 2023Status: CompletedCountry: India Previous Page1 Page2 Page3 Page4 Page5 … Page25 Next