Project StatusAll ProjectsCompleted(209)On Going(27)Select CountryAll CountriesCanada(3)China(12)India(24)Malaysia(190)Others(7)Select Years All2025 (2)2024 (32)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset FIRST DURA LONG SPAN U BRIDGE GIRDER – 80m USED IN RAPID TRANSIT SYSTEM LINK (RTS LINK) ANTARA JOHOR BAHRU DAN SINGAPURAYear: 2023Status: CompletedCountry: Malaysia UHPFRC Jacketing for New Structural Steel I-Beam Used at Zhujiang Delta Water Resources Allocation Engineering (珠江三角水资源配套工程)Year: 2024Status: CompletedCountry: China To Construct Bridge for Maran City Flood Mitigation Project Phase 1, Maran District, Pahang Darul Makmur (Bridge 2)Year: 2023Status: CompletedCountry: Malaysia To Construct Widening Bridge at Lebuhraya Sultan Iskandar (Lebuhraya Mahameru), Kuala Lumpur (Bridge 3)Year: 2023Status: CompletedCountry: Malaysia To Construct Widening Bridge at Lebuhraya Sultan Iskandar (Lebuhraya Mahameru), Kuala Lumpur (Bridge 1)Year: 2023Status: CompletedCountry: Malaysia Construction of Major High level Bridges across Panvel Mahad-Panjim road NH-66, Raigad District in the state of Maharashtra Using DURA BT1500Year: 2023Status: CompletedCountry: India Construction of Integrated Structures on Both Sides of Chandani Chowk Junction, Pune City in the State of Maharashtra, India Using UBG2250 and BT1500Year: 2023Status: CompletedCountry: India Malaysian Dura UHPC Used at Botany Rail Duplication Project, AustraliaYear: 2023Status: CompletedCountry: Others 4-Laning of Existing 2-Laning Strecth From Dharampuri At KM. 117.000 To Lonand, Maharashtra Using BT1500 – 35mYear: 2023Status: CompletedCountry: India To Upgrade Bridge at National Highway Package : 1 CH18+899, Kharwandi, Maharashtra Using BT1500 – 30mYear: 2023Status: CompletedCountry: India Previous Page1 Page2 Page3 Page4 Page5 … Page21 Next