Project StatusAll ProjectsCompleted(238)On Going(57)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(237)Others(8)Select Years All2025 (56)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset Major Bridge on Palki Marg 5 (166+400)Year: 2025Status: On GoingCountry: India Highway Bridge – Pandoh Nerchwok 209+510_KMCYear: 2025Status: On GoingCountry: India Highway Bridge – Pandoh NerchwokYear: 2025Status: On GoingCountry: India To Construct New Bridge for Baietan Avenue (Pearl River Tunnel Section) Liwan District, Guangzhou Using DURA I-beams with length from 24.27m to 27.08m.Year: 2024Status: On GoingCountry: China To Replace Old Bridge at Kampung Baru Tanjung Thai (Pedu), Padang Terap, Kedah Using DURA®IB850 – 15m to 20m Long.Year: 2025Status: On GoingCountry: Malaysia To Replace Bridge at FT175/037/72, Sik, Kedah Using DURA®UBG1250 – 36mYear: 2025Status: On GoingCountry: Malaysia To Construct Road Bridge for Kuala Kedah Jetty, Kedah using IB850-22mYear: 2025Status: On GoingCountry: Malaysia To Construct UHPC Composite Bridge (2.26 km) Used at Indora Flyover Serving the People in Nagpur, India.Year: 2024Status: On GoingCountry: India To Construct a 200-meter Riverwall with an RC capping beam to Prevent Erosion along Kampung Long Bemang , Sungai Apoh , Miri , Sarawak Using DURA® Prestressed Sheet pile PSP750-18M.Year: 2024Status: On GoingCountry: Malaysia To Construct New Bridge For Jalan Semawang ke Tanjung Kuala Gum Gum , Sandakan , Sabah Using DURA®BBG4000 – 105m and DURA®UBG2000 – 50mYear: 2025Status: On GoingCountry: Malaysia Previous Page1 Page2 Page3 Page4 Page5 Page6 Next