Project StatusAll ProjectsCompleted(236)On Going(55)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(233)Others(8)Select Years All2025 (52)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2024Status: On GoingCountry: India TURBHE ROB [Flyover] – Rehabitation of Turbhe ROB on Sion Panvel highway KM. 129/425 to KM. 130/145 Taluka – Thane, Dist – ThaneYear: 2024Status: On GoingCountry: India 4- Laning of existing 2- Laning stretch from Dharampuri at km. 117.00 to Lonand at km. 166.400 (Pkg-IV) on Mohol-Alandi section ( Design Length 49.400 km) of NH-995 in the State of Maharashtra on EPC Mode.Year: 2023Status: On GoingCountry: India Bridge 1 – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® UBG2500-47m (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Bridge 2 – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® IB850m-23.9 (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Bridge 3 – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® UBG2500-45m & 60m (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Bridge 4 – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® UBG2500-50m (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Bridge 5 – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® UBG2500-50m (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Interchange 2 (Ramp A) – To Construct New Bridge for Main Road in Pulau Pinang Using DURA® UBG2500-60m & UBG1500–30m (Jalan-Jalan Utama Di Pulau Pinang)Year: 2024Status: On GoingCountry: Malaysia Missing Link Project on Mumbai Pune Expressway, India Using BT1500-25m to 35m (Pune side)Year: 2024Status: On GoingCountry: India Previous Page1 … Page3 Page4 Page5 Page6 Next