Project StatusAll ProjectsCompleted(225)On Going(59)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(226)Others(8)Select Years All2025 (45)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Construct Linkway Bridge for Kuala Kedah Jetty, Kedah using IB1200-21.1m lengthYear: 2025Status: CompletedCountry: Malaysia Flood Mitigation Project at Sungai Pemandi, Johor using DURA®IB850 – 24m lengthYear: 2025Status: CompletedCountry: Malaysia To Upgrade Bridge at Kampung Bungaraya, Sabah using DURA®IB1300 – 30m length.Year: 2025Status: CompletedCountry: Malaysia To Upgrade Bridge at Kampung Bungaraya, Sabah using DURA®IB1000 – 20m length.Year: 2025Status: CompletedCountry: Malaysia To Replace Old Bridge at Kampung Tasek, Perak using DURA®IB850 – 22m length.Year: 2025Status: CompletedCountry: Malaysia Bhoj Morbe Mumbai Vadodara 076+400 and 069+940 (Project N 32, 33)Year: 2024Status: CompletedCountry: India To Replace Old Concrete Bridge at Pasir Bayam , Raub , Pahang using DURA®UBG2000 – 50m lengthYear: 2025Status: CompletedCountry: Malaysia To Upgrade Gita Lama Bridge at Kampung Gita Lama , Kuching , Sarawak using DURA®IB850 – 16.5m lengthYear: 2025Status: CompletedCountry: Malaysia To Build New Utilities UHPFRC Pipe Bridge at Baling , Kedah using DURA®IB1200 – 28m lengthYear: 2025Status: CompletedCountry: Malaysia TNT – RTO Flyover 1 (NRU002+820), Flyover 2 (NRU003+440)Year: 2025Status: CompletedCountry: India Previous Page1 Page2 Page3 … Page23 Next