Project StatusAll ProjectsCompleted(247)On Going(61)Select CountryAll CountriesCanada(3)China(13)India(39)Malaysia(245)Others(8)Select Years All2025 (69)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset Five Spans Integral UHPFRC Composite Bridge Over The Canal Of Sungai MuarYear: 2018Status: CompletedCountry: Malaysia Single Span UHPC Bridge used at Bukit Gambir (Bridge 1) , JohorYear: 2018Status: CompletedCountry: Malaysia Single Span UHPFRC Bridge for (Bridge 2) Bukit Gambir, Ledang Johor.Year: 2018Status: CompletedCountry: Malaysia Single Span UHPC Bridge used at Sungai Chenerai from Tol Chenor to Bandar Tun Abdul RazakYear: 2018Status: CompletedCountry: Malaysia Single Span Bridge at Kemuning MachangYear: 2018Status: CompletedCountry: Malaysia Single Span UHPC Bridge at Ulu Lawin, PerakYear: 2018Status: CompletedCountry: Malaysia Dura UHPC Single Span Kg. Pahit, GerikYear: 2018Status: CompletedCountry: Malaysia Replacement Bridge at Main Road to Kg. Pahat using Single Span UHPFRCYear: 2018Status: CompletedCountry: Malaysia New Extension and Widening of Batu Kawan Bridge 1 using DuraYear: 2018Status: CompletedCountry: Malaysia 13 Nos. of DURA Bridges Used in JPS Kedah Flood Mitigation ProjectYear: 2017Status: CompletedCountry: Malaysia Previous Page1 … Page21 Page22 Page23 Page24 Page25 … Page31 Next