Project StatusAll ProjectsCompleted(247)On Going(61)Select CountryAll CountriesCanada(3)China(13)India(39)Malaysia(245)Others(8)Select Years All2025 (69)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset Replacing Jambatan Buloh using UHPFRC Accelerate Bridge Construction (ABC) MethodYear: 2021Status: CompletedCountry: Malaysia Upgrading Pan Borneo Highway Sabah from Bongawan to Papar – Bridge over Sg. Kimanis at CH 96 + 375.Year: 2023Status: CompletedCountry: Malaysia Repairing Of Damage To Jetty Structures Using DURA TT275 and DURA Overlay at LKIM Jetty Kuantan, PahangYear: 2023Status: CompletedCountry: Malaysia To Build a New Utilities Bridge for Water Pipe Crossing From Kemaman, Terengganu to Gebeng, Pahang Using DURA UBG1250 – 38mYear: 2023Status: CompletedCountry: Malaysia DURA Jacketing using at LKIM Port, Batu Maung, Pulau PinangYear: 2023Status: CompletedCountry: Malaysia First DURA UHPC Prestressed I-Beam for KTMB bridge over NKVE at KM11.25 East Bound – 25.5m Single Span with 850mm DepthYear: 2023Status: CompletedCountry: Malaysia To Replace Old Bridge at FT008/004/070, Bentong, Pahang Using DURA IB650 – 15.35m Single SpanYear: 2023Status: CompletedCountry: Malaysia To Replace Old Bridge Using DURA UBG2000 – 53m Single Span at Sg. Bintasan, Kota Marudu, SabahYear: 2023Status: CompletedCountry: Malaysia To Construct New Bridge using DURA UBG1750-30m at Sg. Liau, Keningau, SabahYear: 2023Status: CompletedCountry: Malaysia To Upgrade Bridge Over Sg. Tambilung Using DURA IB850-20m, KM1.93 Jalan Sayap, Kota Belud, SabahYear: 2023Status: CompletedCountry: Malaysia Previous Page1 … Page15 Page16 Page17 Page18 Page19 … Page31 Next