Project StatusAll ProjectsCompleted(235)On Going(54)Select CountryAll CountriesCanada(3)China(13)India(34)Malaysia(231)Others(8)Select Years All2025 (50)2024 (37)2023 (48)2022 (9)2021 (19)2020 (22)2019 (17)2018 (14)2017 (15)2016 (11)2015 (13)2014 (13)2013 (10)2012 (5)2011 (2)2010 (3)2008 (1) Reset To Build a New Utilities Bridge for Water Pipe Crossing From Kemaman, Terengganu to Gebeng, Pahang Using DURA UBG1250 – 38mYear: 2023Status: CompletedCountry: Malaysia DURA Jacketing using at LKIM Port, Batu Maung, Pulau PinangYear: 2023Status: CompletedCountry: Malaysia First DURA UHPC Prestressed I-Beam for KTMB bridge over NKVE at KM11.25 East Bound – 25.5m Single Span with 850mm DepthYear: 2023Status: CompletedCountry: Malaysia To Replace Old Bridge at FT008/004/070, Bentong, Pahang Using DURA IB650 – 15.35m Single SpanYear: 2023Status: CompletedCountry: Malaysia To Replace Old Bridge Using DURA UBG2000 – 53m Single Span at Sg. Bintasan, Kota Marudu, SabahYear: 2023Status: CompletedCountry: Malaysia To Construct New Bridge using DURA UBG1750-30m at Sg. Liau, Keningau, SabahYear: 2023Status: CompletedCountry: Malaysia To Upgrade Bridge Over Sg. Tambilung Using DURA IB850-20m, KM1.93 Jalan Sayap, Kota Belud, SabahYear: 2023Status: CompletedCountry: Malaysia To Upgrade and Build a New Bridge Sg. Puson, KM2.20 Jalan Stesen TV Tampasak, Papar, Sabah Using DURA IB850 – 20mYear: 2023Status: CompletedCountry: Malaysia To Construct New Bridge using TBG1375 – 25m at Sg. Perangin, Oriental Village, Langkawi, KedahYear: 2023Status: CompletedCountry: Malaysia Riveria City Bridge 52m over Klang RiverYear: 2023Status: CompletedCountry: Malaysia Previous Page1 … Page8 Page9 Page10 Page11 Page12 … Page24 Next